Darß & Zingst OHVS for TSO 50 HERTZ – 2 X 450 MW
Two platforms Darß & Zingst by 50Hertz for the OST-6-1 offshore wind farm in the German Baltic Sea.
Two platforms Darß & Zingst by 50Hertz for the OST-6-1 offshore wind farm in the German Baltic Sea.

With a total capacity of 927 MW, this will be the largest and most powerful offshore wind farm in the Baltic Sea. The consortium HSI (HSM Offshore Energy, Smulders and Iv) are responsible for the engineering, procurement, construction and installation of both substations and jackets. The substructures of the project is a steel construction supporting the topside with 6 legs with 6 piles (i.e. 1 at each leg). It is designed as a Pile through Leg design for shallow water and to be transported in a vertical orientation on a barge and installed by dual crane lift with ILT’s and floating spreader bars. The substructure height is approx. 33 metres.